ChuckCD
Civil/Environmental
- Dec 6, 2018
- 1
I have developed a model of proposed open infiltration basin(s) that are chained together by overflowing into each other as the runoff makes it to the low end of the site and final overflow. Each of these basin(s) is set up as a Pond with a drainage sub-catchment defined. I have a problem where one basin that is flowing into the other is not appropriately shown in the graph. Basically I have a 0.56 Ac drainage area to Basin #1 that shows an overflow of 1.18cfs. Basin #1 flows via a swale No2 to Basin #2. Basin #2 also has a swale No3 (Showing 2.29cfs) directed into it along with Swale No2. The Graph for Basin #2 should have an inflow of +-3.47cfs but it only has 2.82cfs. I am being questioned by the reviewer as to why it does not have the complete inflow amount. He says it should show two separate inflow amounts on the graph. I don't think HydroCAD has this option. I think it simply adds the two together and provides the Peak of the two flows.
Any help would be greatly appreciated!!
Any help would be greatly appreciated!!