Dear All, I have one problem. A tank has been hydrotested but unfortunately the contractor miss to install (welding)anode bed inside the tank (in the drawing, not mentioned about anode bed but mentioned in the contract requirement). Did the contractor still need to carry out the hydrotest or not? Which clause needs to refer?