Solangel
Structural
- Aug 31, 2001
- 14
Hi, I need to know how to do a grading in a terrain digital model with a 0.50m increment. I want to know if it is possible to put a first level and increase the next field 0.50m up from the first one.
God Bless you
God Bless you