JoshH726
Structural
- Aug 3, 2010
- 83
When evaluating crane loads in combination with wind and snow per Exception 1 of the ASD load combinations of IBC 1605.3 (2012 or 2015), do you take 0.5W? or 0.5(0.6W)? I've went back to IBC 09 which had the 0.5W, so I wonder how the clause survived the great galactic shift of 7-10? Thanks in advance