jcook311
Civil/Environmental
- Feb 14, 2008
- 6
Basically there are three ponds. Once the highest ponds reaches it's allowed stage it goes through a drop structure and down a pipe to the next and etc.
I believe in error occurs in calculation once the pipe gets so steep. If I have the pipe going at a small
slope it's causes pond staging lower than the greater slope I want to design. For instance I'll increase the slope gradually and at 9% the ponds stage jumps ~6'! Thoughts?
Thanks.
I believe in error occurs in calculation once the pipe gets so steep. If I have the pipe going at a small
slope it's causes pond staging lower than the greater slope I want to design. For instance I'll increase the slope gradually and at 9% the ponds stage jumps ~6'! Thoughts?
Thanks.