The purpose is to identify the cause of the failures and make corrective repairs. The pumps have been in service since the late 1970's and have exhibited high vibrationa at vane pass frequency but operated with normal maintenance without failure for approx 10 years at a time. Since 2003, five of the pumps modified with new diffusers to reduce high vibrations at vane pass frequency. All had balancing device and thrust bearing failure. the modified diffusers have 9 vanes instead of 8. This is a boiler feed 5 stage pump. I did the CFD analysis of considering the cases of 8 & 9 vanes but as per that analysis hard to say anything.