TonyES
Structural
- Oct 2, 2007
- 37
In a cantilevered concrete retaining wall what are some standard practices that any of you take for including the influence of either a 90 degree bend in the wall or a counterfort. I have typically used a 1 to 1 ratio but think that may be unconservative. I was wondering what other engineers do. Thanks