bigfoot567
Structural
- Jun 16, 2008
- 1
Have a few 120 watt panels, a nice wind gen, plenty of 130Amp/Hr 12 volt UPS batteries, inverters, charge controllers, diversion load devices, lots of 2/0 welding cable, misc parts/pcs - need assistance in designing for switches, fuses, breakers, guages....and schematics. To be designed for the sun-rich far southwest TX desert region for a simple off-grid cabin under const now.
Anyone with patience and time to assist me, via long distance emails, in this adventure is appreciated.
thanks in advance for your assistance.
Bill in TX
Anyone with patience and time to assist me, via long distance emails, in this adventure is appreciated.
thanks in advance for your assistance.
Bill in TX