L775
Structural
- Feb 4, 2001
- 48
Threshold inspect fees for a large threshold commercial building in South Florida, (without any drawings).
Project involves pilecaps, reinforced concrete columns shearwalls, post-tensioned concrete slabs, and reinforced masonry...
What would you think is a resonable estimate for the lump sum fee based ONLY on the total cubic yards that was provided.
(i.e. $/cy)
Thank you for your thoughts,
Project involves pilecaps, reinforced concrete columns shearwalls, post-tensioned concrete slabs, and reinforced masonry...
What would you think is a resonable estimate for the lump sum fee based ONLY on the total cubic yards that was provided.
(i.e. $/cy)
Thank you for your thoughts,