In case that a pressure vessel or another static equipment periodic inspection was lapsed and was not done on time for many reasons such as Force Majeure, lack of maintenance contractor, not enough budget; which is the role of the plant inspector here? and what he should do?
And how to ensure the equipment integrity?
Thanks and best regards,
In case that a pressure vessel or another static equipment periodic inspection was lapsed and was not done on time for many reasons such as Force Majeure, lack of maintenance contractor, not enough budget; which is the role of the plant inspector here? and what he should do?