Hi guys,
I am in process of writing integrity / maintenance plan for silica gel towers at one of our facilities. We have 6 towers for gas dew point control (4 at adsorption, 1 at cooling & 1 at regeneration at one time)
I need to know what are the requirements of maintenance of these processes units in terms of silica gel integrity & maintenance. For example which type of maintenance required and frequencies.
I have Buffer silica (FNG) bed (1.4 ft) and then HC-5 grade silica gel bed (20.8 ft) in each tower.
Appreciated if I know bead bed inspection & break through procedures with recommended frequencies.
Thanks
Imran
I am in process of writing integrity / maintenance plan for silica gel towers at one of our facilities. We have 6 towers for gas dew point control (4 at adsorption, 1 at cooling & 1 at regeneration at one time)
I need to know what are the requirements of maintenance of these processes units in terms of silica gel integrity & maintenance. For example which type of maintenance required and frequencies.
I have Buffer silica (FNG) bed (1.4 ft) and then HC-5 grade silica gel bed (20.8 ft) in each tower.
Appreciated if I know bead bed inspection & break through procedures with recommended frequencies.
Thanks
Imran