Guys!
Anybody who is kind enough to briefly explain to me (or recommend a good reference) about:
1-the procedure of installing flexible risers on the seabed and attaching them to let's say a subsea manifold/PLEM. (I know it should be very similar to pipeline initiation, laying and lay-down but how they manage to put it in right place while there will be no spool piece later to compensate distance to PLEM)
2- the procedure of taking it up to the surface for connection to sea-surface facility.
I believe no method leads to dragging the flexible pipe on seabed is allowed as it might damage the sheath, am I right?
Anybody who is kind enough to briefly explain to me (or recommend a good reference) about:
1-the procedure of installing flexible risers on the seabed and attaching them to let's say a subsea manifold/PLEM. (I know it should be very similar to pipeline initiation, laying and lay-down but how they manage to put it in right place while there will be no spool piece later to compensate distance to PLEM)
2- the procedure of taking it up to the surface for connection to sea-surface facility.
I believe no method leads to dragging the flexible pipe on seabed is allowed as it might damage the sheath, am I right?