juancarloscastrogale
Electrical
- Oct 14, 2002
- 14
Hi,
I´m working in the subject of insulator pollution and I need to built a chamber fog for artificial pollution test. I want to look for the worse humidity and temperature condition before the flashover at diferent pollution level but may high voltage transformer does not have the power necesary to carry out my project. I'm thinking do it measuring the leakage current and I need information, articles or some experience about it.
Thanks a lot.
Juan Carlos Castro Galeano
Valle University Cali, Colombia
High Voltage Lab.
I´m working in the subject of insulator pollution and I need to built a chamber fog for artificial pollution test. I want to look for the worse humidity and temperature condition before the flashover at diferent pollution level but may high voltage transformer does not have the power necesary to carry out my project. I'm thinking do it measuring the leakage current and I need information, articles or some experience about it.
Thanks a lot.
Juan Carlos Castro Galeano
Valle University Cali, Colombia
High Voltage Lab.