Our company has been using EPDM for two years now. It was configured by one of our engineers. To revise a drawing, an ECR is initiated. The data card fields- changes, reasons, disposition etc. are filled in and then it is sent for approval. The PE approves the ECR and it goes to Doc Control to be unlocked for me to work on. I check the drawing out and enter the same information again into the part data card.
My question is, can the ECR data card inputs be carried over automatically to the drawing so the information doesn't have to be entered twice?