I am currently involved in a project which has several Sewage treatment plants (STP) to treat sewage and use it for irrigation of landscape, parks; median etc. The project area is around 15000 acre. There are total 10 STPs. Some are located closer to each other while some are at longer distance to each other. The project is divided into different blocks. The treated water from STPs will be pumped into distribution tanks, proposed in each blocks, which eventually be used for irrigating that particular block. The client wants to interconnect the STPs so that in case of low sewage generation or emergency, the treated water from any STP can be used to fulfil the irrigation need of other area.
I am planning to provide Wet well and pump station at each STP so that treated water from STP will enter the wet well through gravity.
Option 1:
One possibility is to connect all wet well together in close loop so that each can transfer treated water to each other. Further each wet well will be responsible to fill certain tanks closer to that wet well through branch network.
For example there are 10 wet well are all connected through loop network.
Wet well 1 can supply treated water to distribution tank 1,2,3,4 while wet well 2 can supply treated water to tank 5,6,7,8.
Incase if wet well 1 do not have sufficient treated water than it cannot supply to distribution tank 1,2,3,4 until it get water from some other wet well.
Option 2:
All the wet wells and distribution tanks will be connected into a closed loop pipe network.
Each wet well will have float switches, as the water level rises to certain depth the pumps will start pumping into a closed loop network and distribution tanks will start filling. Each distribution tank will have modulating float valve to avoid overflow of tank and maintain pressure in the line. As the tanks get filled the pressure in the system will rise which eventually stop the pump.
All pumps will be VFD based
Has anyone designed such scheme before?
What are pros and cons of each option?
What should be the best way to operate such scheme?
I want to discuss the view of other regarding the scheme and what would be the best scheme in such scenario?
Thanks
I am currently involved in a project which has several Sewage treatment plants (STP) to treat sewage and use it for irrigation of landscape, parks; median etc. The project area is around 15000 acre. There are total 10 STPs. Some are located closer to each other while some are at longer distance to each other. The project is divided into different blocks. The treated water from STPs will be pumped into distribution tanks, proposed in each blocks, which eventually be used for irrigating that particular block. The client wants to interconnect the STPs so that in case of low sewage generation or emergency, the treated water from any STP can be used to fulfil the irrigation need of other area.
I am planning to provide Wet well and pump station at each STP so that treated water from STP will enter the wet well through gravity.
Option 1:
One possibility is to connect all wet well together in close loop so that each can transfer treated water to each other. Further each wet well will be responsible to fill certain tanks closer to that wet well through branch network.
For example there are 10 wet well are all connected through loop network.
Wet well 1 can supply treated water to distribution tank 1,2,3,4 while wet well 2 can supply treated water to tank 5,6,7,8.
Incase if wet well 1 do not have sufficient treated water than it cannot supply to distribution tank 1,2,3,4 until it get water from some other wet well.
Option 2:
All the wet wells and distribution tanks will be connected into a closed loop pipe network.
Each wet well will have float switches, as the water level rises to certain depth the pumps will start pumping into a closed loop network and distribution tanks will start filling. Each distribution tank will have modulating float valve to avoid overflow of tank and maintain pressure in the line. As the tanks get filled the pressure in the system will rise which eventually stop the pump.
All pumps will be VFD based
Has anyone designed such scheme before?
What are pros and cons of each option?
What should be the best way to operate such scheme?
I want to discuss the view of other regarding the scheme and what would be the best scheme in such scenario?
Thanks