tareenmi
Electrical
- Jun 5, 2015
- 1
I have a situation where a 69KV transmission substation with 3 inch tubular aluminum bus is welded to 69KV Generating Station (rated at 75 MW) bus with 2 inch tubular bus as shown in the attached picture. Does this provide a good connection? If not then what is best solution to connect two stations with different pipe sizes. Please note the two stations are new. Any suggestion will be highly appreciated.
M. I. Tareen, P. Eng.
Electrical Power Commissioning System Engineer
M. I. Tareen, P. Eng.
Electrical Power Commissioning System Engineer