sdahsuan
Electrical
- Dec 2, 2002
- 1
Hi,
I would like to know whether we need to provide grid mat design for power plant as per IEEE665, unlike the onw we follow gird mat design for substation as per IEEE80. I am bit confused whether providing ground ring conductor around the equipment package(such as GT, STG)and other building and having all the ground ring interconnected with suitable earth rod would be sufficient. Please advise
I would like to know whether we need to provide grid mat design for power plant as per IEEE665, unlike the onw we follow gird mat design for substation as per IEEE80. I am bit confused whether providing ground ring conductor around the equipment package(such as GT, STG)and other building and having all the ground ring interconnected with suitable earth rod would be sufficient. Please advise