Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Is this slope possible?

Status
Not open for further replies.

Eugene Lim

Civil/Environmental
Jul 11, 2018
14
0
0
AU
Screenshot_2021-08-26_at_3.48.34_PM_vfoy9p.png


Q1: What is the construction sequence for the batters?
Q2: Hydroseeding with jute matting where the slope overlay is thin. But this technology will not work near the toe of the slope due to thickness. Is the slope stable under its own weight?
 
Replies continue below

Recommended for you

Q1: Build up and extend by approx 1m and cut back to desired slope, if not too high for excavator.
Q2: Possibly, do you have a slope constructed of PEAT or ROCK? its a simple calculation that you should learn how to do.
 
EireChch Thanks for your response. No peat or rock. Engineered fill. Are you talking about the infinite slope calculation?
 
geotechguy1 The fill material has not been decided, but is currently well-graded sand. Beneath the embankment is stiff clay, followed by dense sand and sandstone. The existing ground at the toe of the slope continues to slope down. It would require 4-5 m extra to extend the slope to flat ground.

Thanks for your response!
 
Status
Not open for further replies.
Back
Top