hello,
what should i be considering in order to jack (lift) 190,000lb of equipment. the base is structural concrete with a lift of grout. the grout is not yet in place.
i have thought that the compressive strength of the grout should equal or better the concrete and that a metal base plate should be placed between the back and the grout. this is in response to concerns over compression and pressure?
Also what would the minimum time for the grout to reach adequate strength be?
I look forward to responses.
eli
what should i be considering in order to jack (lift) 190,000lb of equipment. the base is structural concrete with a lift of grout. the grout is not yet in place.
i have thought that the compressive strength of the grout should equal or better the concrete and that a metal base plate should be placed between the back and the grout. this is in response to concerns over compression and pressure?
Also what would the minimum time for the grout to reach adequate strength be?
I look forward to responses.
eli