dmccanna
Civil/Environmental
- Oct 23, 2002
- 1
We will be jetting 10"dia. pilings into the riverbottom to support a pier. Hard pan (hard packed sand) is about 18 to 20 foot deep. How far into the hard pan should the pilings be set?