JimmyD123
Civil/Environmental
- Jan 5, 2017
- 9
I am designing connection above a wall where 2 different types of joists meet above the wall (as seen in pdf). The TJI's coming in from the left will bear on the wall itself and butt up to a Rim Joist, I need a joist hanger to hold up the 2x8's that frame in on the other side of the Rim Joist. I have called out a Simpson LUS26 hanger that can use 10d x 1-1/2" nails, but the Rim joist is only 1-1/4" thick. Any ideas on how I can frame these 2x8s onto the rim joist?? PLEASE SEE ATTACHED PDF