Jun 22, 2012 #1 Cocorocox Mechanical May 6, 2012 3 0 0 PE Im working on 850 Combined Cicle Power Plant, We have 3 gas turbine (siemens) x 1 steam turbine (GE). So I have a problem to connect KKS system from siemens to GE system, someone has an idea, how can i connect to put it in order? I want to keep a secuence!!
Im working on 850 Combined Cicle Power Plant, We have 3 gas turbine (siemens) x 1 steam turbine (GE). So I have a problem to connect KKS system from siemens to GE system, someone has an idea, how can i connect to put it in order? I want to keep a secuence!!
Jun 23, 2012 #2 eyec Industrial Oct 25, 2003 422 0 0 US convert them both to IEEE 806. it may take a lot of work but i was involved in converting KKS into the equipment catalog system the company used. Upvote 0 Downvote
convert them both to IEEE 806. it may take a lot of work but i was involved in converting KKS into the equipment catalog system the company used.