landslide stabilizaton

Status
Not open for further replies.

Marshwater

Geotechnical
Aug 2, 2005
4
i have a massive movement i am looking at to stabilize. it is a 75% slope moving as one mass about 40*100. it seems it is the accumulation of cut and undesired topsoil/cutting from cutting the lot (residential). can ya'll reccomend any techniques to stabilize this movement?

marshwater
 
Replies continue below

Recommended for you

Can you provide more information? Things like water table/piezometric level, materials, rate of movement, movement tied to weather or season, depth of sliding surface (if there is a distinct rupture surface), etc.

By a 75% slope, do you mean 0.75 vertical to 1 horizontal, or the other way around? Is the 40x100 the size in feet or in meters?

Best regards,
DRG
 
DRG,

thanks for your reply. i will have all that info posted here on monday.

MW
 