maddogxoxo
Civil/Environmental
- Jan 2, 2008
- 3
I am analyzing the drainage of a canyon. The total area is 6,909.92 ac. I am wondering what the best way to go about this. I have started HEC-HMS, but the flows are extremly over conservative. I only used 6 basins in my model, but the areas are still so big, that the intensity is a killer. I can break it down further into 27 subasins, but is that too many and a waste of time? Please advise.
Maddog
Maddog