For the figure below, what is the end of construction horiz shear and moment at the base of the stiff cantilever wall?
The 90 pcf slurry (UCC = 50psi to 300psi) will be placed in 2 lifts at 2.25 ft tall per lift.
The top engr fill unit weight will be no more than 120 pcf, and will be lightly compacted.
The 90 pcf slurry (UCC = 50psi to 300psi) will be placed in 2 lifts at 2.25 ft tall per lift.