bassonet
Mechanical
- Jul 6, 2011
- 5
We are installing 35m diameter Clarifiers (CCD) which would handle a Sulphuric acid copper ore Leach solution of PH roughly 1.5. The floor plates would be covered by a layer of sludge, the wall mainly expaosed to a varying density slurry.
Do we need to pickle and passivate the LDX 2101 floor and wall welds?