Hi,
May I ask what methods are used to level a rock seabed in order to have a linear bed, to place concrete sleeper beams and a precast hollow block quay wall in a depth of sea water of 3.9m?
This is after dredging works are conducted to remove silt material.
Thank you for your help.
May I ask what methods are used to level a rock seabed in order to have a linear bed, to place concrete sleeper beams and a precast hollow block quay wall in a depth of sea water of 3.9m?
This is after dredging works are conducted to remove silt material.
Thank you for your help.