Hello
Existing Flare stack (187 ft) is required to be taken down from vertical position to horizontal position for repair. Original drawings for this stack indicate that the original lugs are only for erection purpose and shall not be used after erection.
One option recommended to me is to perform full NDE on these lugs and check the applicability of reusing them. If not, I would like to know what an alternative is. Note that additional lugs cannot be weld before taking the stack down.
As I am unfamiliar to alternate lifting methods, any suggestions welcome. Thank you.