Hello,
I'm designing a tray tower 13 ft Dia and 0.875" thk. Due to some space constraint in the field, this tower needs to be cut into two halves. I need some insight for evaluating stress in the design of tailing lug for top section and trunnion for bottom section as these will be the open part during shipping. Has anybody been in this situation?
I'm designing a tray tower 13 ft Dia and 0.875" thk. Due to some space constraint in the field, this tower needs to be cut into two halves. I need some insight for evaluating stress in the design of tailing lug for top section and trunnion for bottom section as these will be the open part during shipping. Has anybody been in this situation?