Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Limit JT save to work part only

Status
Not open for further replies.

JDare

Mechanical
Feb 9, 2017
2
I have recently stumbled on a large assembly that I'm working on and save times have been brutal (around 2 hours). I am linked to Teamcenter (NX 11.0.2.7 and Teamcenter 11). I noticed that when I uncheck Save JT in the save options that it only takes 5 minutes to save. What is it doing on JT save?!? Is it going out and saving, or trying to save on released parts, a JT file for each subpart in all the subassemblies? There is no geometry at the top level assembly so there isn't even a JT file being created on the top level part that I'm working on that takes so long to save if JT Save is turned on...

I use JT files for loading lightweight - is there a way to limit JT save creation on only the work part? Any thoughts on what is going on?
 
Replies continue below

Recommended for you

Status
Not open for further replies.

Part and Inventory Search

Sponsor