Dec 16, 2003 #1 MikalT Petroleum Feb 13, 2002 6 0 0 US I'm running an 1 1/2" schedule XS 304L SS pipe to carry liquid nitrogen (-320 deg Fahrenheit) to an injection quill at a reactor. What is the recommended maximum span (between supports) for the 1 1/2" line?
I'm running an 1 1/2" schedule XS 304L SS pipe to carry liquid nitrogen (-320 deg Fahrenheit) to an injection quill at a reactor. What is the recommended maximum span (between supports) for the 1 1/2" line?