cariboo
Geotechnical
- Jun 21, 2008
- 6
How can i calcutate a live load for a 20T loading shovel? The constructor wants to use crane a and shovel over a slab in two points of load each one with 10T. This points of loading will be separate 2.4m. It will be 35kN/m2 + 20T (this 20T is live load). How can i estimate a settlement for this situation?