AndersHansson
Marine/Ocean
I have created an excel sheet that gives output in form of *.dat files that contains the points from which I want to create splines from.
I now have 30 *.dat-files that corresponds to one spline each.
The problem now is that it simply takes a lot of time to load the files one by one.
I would like to mark all dat-files and load at the same time, but it doesn't seem to be possible.
BR
Anders Hansson
Engineer
I now have 30 *.dat-files that corresponds to one spline each.
The problem now is that it simply takes a lot of time to load the files one by one.
I would like to mark all dat-files and load at the same time, but it doesn't seem to be possible.
BR
Anders Hansson
Engineer