Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Loading Docks

Status
Not open for further replies.

migotis

Civil/Environmental
Jan 10, 2003
4
US
I am working on a loading dock that needs to be renovated due to trucks getting stuck. The profile of the dock is as follows:

Ramp from street to level section 1' rise in 5 feet. Level section for approximately 12'. Ramp down at approx 5% to dock. Want to remove level section to prevent trucks from getting stuck. Is there a maximum grade change that will prevent the trucks from getting stuck. I was looking at ramping from street approximately 16' at 6%. Then tie into existing ramp which is slope 5% down to the dock. That is a change of grade of 11% is this too much?
 
Replies continue below

Recommended for you

Draw the profile on CADD and overlay the truck. That's the quickest way to get an "empirical" answer to your question. Robert Weber, EI
Maurer-Stutz, Inc
"I am satisfied that your answer is correct. I am not, however, satisfied that your answer is right."
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top