I can't find anywhere in the NFPA 13 that addresses the hanger locations at bends or change in directions. Are supports not required within a certain distance of a change of direction? All I see in NFPA 13 for 4" steel pipe is every 15'. I am in a seismic category B so 9.4 doesn't apply. I also was searching for a maximum length allowed for 3/8" threaded rod supporting steel pipe. I have seen stiffeners on threaded rod before but I cant find where its called out to be of a certain length before installing them. Can anyone help with these two questions.
Thanks