Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

LOMR

Status
Not open for further replies.

taikos186

Structural
May 23, 2008
12
Can anyone advise on LOMR. For the HEC-HMS modeling do we use existing or the future land use information?
 
Replies continue below

Recommended for you

Typically the peak flows originally developed by FEMA/USACE and shown in the FIS studies were based on existing conditions parameters. I have seen FEMA accept future land-use conditions if the community requests them to. But that really depends on the community's floodplain administrator and the development condition of the watershed.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor