jtdpsu
Structural
- Jan 26, 2005
- 2
does anybody know of any requirement that f'c @ 7 days must be at least 75% f'c? on the particular job i'm working on (washington DC), we've had about 50% f'c after 7 days for several spread foundations...obviously~generally speaking~high early strength isn't as important with foundations as it is with elevated slabs. however, low early breaks are often an indicator of low 28 day breaks, but not always. the owner of this building is very upset about the low 7 day breaks, but i'm not aware of any ACI *requirements* or recommendations with regards to f'c @ 7 days, so i really can't come down on the GC until the 28 day breaks are in, right? the owner is convinced that he's not getting what he's paid for
any thoughts?
thanks in advance...
any thoughts?
thanks in advance...