easaw
Geotechnical
- Jan 21, 2008
- 14
What should be the concrete placement methods to be monitored for a mass concrete having a size of 10m * 10m* 25m ? And also, what type of concrete mix design should be specified as concrete mix so that to maintain low heat of hydration in the mass concrete?