JBpower
Electrical
- Nov 17, 2007
- 5
I recently stumbled upon a challenge in the construction site I am supervising. We are guided by two main drawings, 1) Tender drawings, 2) Shop drawings. The tender drawings indicate that there are two D.Bs each for a separate room in a specific building.
Unfortunately, there were no load tables for the two D.Bs, which means no feeders. I know it is an error from the ministry and it will take time before they come up with edited version of the tender.
A proposed solution was to take two feeders from two nearby Main Switch Boards (MSB), each will feed a D.B and new load calculations will be performed. However, one of the nearby MSB dont have a spare, and currently we are studying weather to get a new MSB from the manufacturer with more spares and replace the old one.
please advise...
JB (PAHW-Kuwait)
Unfortunately, there were no load tables for the two D.Bs, which means no feeders. I know it is an error from the ministry and it will take time before they come up with edited version of the tender.
A proposed solution was to take two feeders from two nearby Main Switch Boards (MSB), each will feed a D.B and new load calculations will be performed. However, one of the nearby MSB dont have a spare, and currently we are studying weather to get a new MSB from the manufacturer with more spares and replace the old one.
please advise...
JB (PAHW-Kuwait)