alanElec
Electrical
- Feb 14, 2013
- 78
I have 4 runs of single core 630 mm2 cable running between AMF panel and Feeder pillar..The feeder pillar side cable is not terminated while it is already terminated in the AMF Panel.I want to meggar these cables.Should I open the termination at AMF panel side before meggaring?
Or si it good if the breaker is in OFF position?
Also if I am using a voltage of 500 V for testing, what are the typical values to be obtained ..?
Or si it good if the breaker is in OFF position?
Also if I am using a voltage of 500 V for testing, what are the typical values to be obtained ..?