Not sure if this is the right place to post this... but here goes.
I am a QE developing standards or (best practices) procedure for Machine Operators (Lathe, CNC Mill, Manual Mach, etc). One of the aspects is inspecting the parts that come off the of the machine throughout the run. Does anyone have a suggested sampling plan? Or even what they use so I can get some ideas on what we should be doing. We are looking at any orders under 10 you 100% inspect all dimensions created in the operation. 11 or more then the operator would be responsible for checking every 3rd part. In addition, there might be dimensions you would only have to verify on the 1st part only.
Thoughts????
I am a QE developing standards or (best practices) procedure for Machine Operators (Lathe, CNC Mill, Manual Mach, etc). One of the aspects is inspecting the parts that come off the of the machine throughout the run. Does anyone have a suggested sampling plan? Or even what they use so I can get some ideas on what we should be doing. We are looking at any orders under 10 you 100% inspect all dimensions created in the operation. 11 or more then the operator would be responsible for checking every 3rd part. In addition, there might be dimensions you would only have to verify on the 1st part only.
Thoughts????