joyo2
Civil/Environmental
- Nov 25, 2009
- 2
I have about 11 pump stations using the mainfold force main. I was asked to do an hydraulic analysis to evaluate the two at end of the force main (farthest) by watercad.
How should I do? I mean there are 9 other pump stations, which one(s) should I put on, which one should I put off?
Is there any rule to set up the stutus of the pumps (on/off) to evaluate the other pump (the one I want to valute)?
Thanks,
How should I do? I mean there are 9 other pump stations, which one(s) should I put on, which one should I put off?
Is there any rule to set up the stutus of the pumps (on/off) to evaluate the other pump (the one I want to valute)?