Majid_F93
Geotechnical
- Feb 2, 2018
- 27
Hi,
I am using map solution technique in my model. I ran my model and then I did below steps:
1- I obtained orphan mesh in the last increment from the previous job
2- Change orphan mesh into the new part
3- Assign materials and boundary condition
4- Mesh it
My question is, I am using amplitude loading and load change with time, my total time is about 21700s. I run my first job in 16200s and then in the second job I put time period equal to 5500s.
How do I input amplitude loading in the second input file for continuing job?
Because when I exert amplitude loading, my model didn't converge.
I am using map solution technique in my model. I ran my model and then I did below steps:
1- I obtained orphan mesh in the last increment from the previous job
2- Change orphan mesh into the new part
3- Assign materials and boundary condition
4- Mesh it
My question is, I am using amplitude loading and load change with time, my total time is about 21700s. I run my first job in 16200s and then in the second job I put time period equal to 5500s.
How do I input amplitude loading in the second input file for continuing job?
Because when I exert amplitude loading, my model didn't converge.