broncosfan
Structural
- Jul 29, 2004
- 44
We are adding a 90' long x 25' wide connector between two warehouses. There will be two 90' long, 12" thick reinforced masonry walls. The roof will consist of 25' long joists spaced at 6' on center with 18ga type B metal roof deck. The 18ga metal roof deck will be tied into the precast concrete shear walls of the existing warehouses.
I have a 90'x25' metal deck diaphragm which works for strength and deflection (36/7 puddle welds with #10 sidelaps at 12"). This diaphragm length-to-width ratio exceeds IBC table 2109.2.1.2 which states the maximum length to width ratio is 2:1 between masonry shear walls. BUT, my connector building is 90' between PRECAST CONCRETE SHEAR walls (we are not adding 25' long masonry shear walls at each end). So, am I ok here? Am I missing something? Thanks for the input.
I have a 90'x25' metal deck diaphragm which works for strength and deflection (36/7 puddle welds with #10 sidelaps at 12"). This diaphragm length-to-width ratio exceeds IBC table 2109.2.1.2 which states the maximum length to width ratio is 2:1 between masonry shear walls. BUT, my connector building is 90' between PRECAST CONCRETE SHEAR walls (we are not adding 25' long masonry shear walls at each end). So, am I ok here? Am I missing something? Thanks for the input.