fbaxley
Structural
- Feb 25, 2005
- 18
I'm designing a house near the coast of SC. Plans call for continuous solid 8" CMU foundation wall (approx 4 to 5' tall w/no backfill) + 4" brick veneer, which makes a 12" foundation wall. Details show brick bonded to CMU with brick-ties and perimeter 2x6 walls/sill plate bearing directly on the outer portion of the foundation wall, which is the brick veneer. Is it adequate or in compliance with Code to support a bearing wall on 4" brick veneer that is bonded to 8" CMU making a 12" wall?