VirtualEngineer
Structural
- Jan 20, 2005
- 48
Has anyone out there had personal experience designing a mass concrete pour which required a post concrete placement cooling system.
If so, do you have any tips regarding design or pitfalls to avoid.
I already have found considerable ACI documentation so I am really asking for personal insights.
Regards,
JPJ