This is kind of hard to explain but it is driving me crazy. I will make up a large assembly of these bi-fold doors and as I go along everything works fine. Then I will start moving the door to make sure they will open and close. They will work then i find something to tweek and I will get massive rebuild mating errors (Over defining, un-solvable, and not-paralel)
I have tried it with different sub-asseblies and then with more top level parts. I'll have it working perfectly then i will open up a part or switch back to it and it is all messed up. Or I will go home for the night and come back in the morning and it will not load properly with messed up mates.
What is the problem, I've been suppressing and unsuppressing mates and eventually can get it to work with all the mates good then it will screw up again. It is driving me crazy what could be wrong.
Mind you I have made the same assebmly 5 different times 5 different ways with them all failing eventually.
Thanks
I have tried it with different sub-asseblies and then with more top level parts. I'll have it working perfectly then i will open up a part or switch back to it and it is all messed up. Or I will go home for the night and come back in the morning and it will not load properly with messed up mates.
What is the problem, I've been suppressing and unsuppressing mates and eventually can get it to work with all the mates good then it will screw up again. It is driving me crazy what could be wrong.
Mind you I have made the same assebmly 5 different times 5 different ways with them all failing eventually.