engg9009
Petroleum
- Nov 19, 2008
- 4
I'm working on a project where we're exposing a pipeline while it is in service to repair some damaged coating. I'm wondering how to figure out the maximum allowable stress due to the bending of the pipe, so that I can decide how much pipe to excavate at one time. Any help would be greatly appreciated.
Thanks