NickParker
Electrical
- Sep 1, 2017
- 435
Can reliable Coordination/selectivity between Upstream and downstream MCBs possible both in the overload and in the instantaneous regions? (or) is it better to go for Upstream MCCB to downstream MCB?
The Upstream system is of 400/230V AC (Phase-Phase / Neutral) and the downstream power consumer is 230V AC (Phase to Neutral).
The Upstream system is of 400/230V AC (Phase-Phase / Neutral) and the downstream power consumer is 230V AC (Phase to Neutral).