Michael Matkowsky

Civil/Environmental
Oct 5, 2018
3
0
0
CA
If a coastal engineer specified 4 to 5 ton armour stone and the construction had a range of sizes, say 3-5 ton and over
50 % of the stone was 4.5 ton or more, is the engineer's spec being satisfied ?
 